The difficulty is that tile can be installed over a number of substrates, and each requires specific preparations to ensure a long-lasting tile floor. Know exactly how much you need with our tile calculator. Some backer board manufactures have identified the locations on the backer board where the screws need to be placed. Concrete subfloors should have a coarse finish to form the bond with the thin-set. To prepare a concrete subfloor for installing tile, you’ll need to do a different kind of preparation. Use this Home Depot guide, How to Install a Tile Floor, for more information. Comb the mortar with the notched edge of the trowel at a 45-degree angle to the floor, taking care to make sure the trowel lines go in the same direction. This guide will show you how to prepare your subfloor for a tile installation project to ensure that it’s fit to support ceramic or porcelain tile. Level Concrete Subfloor and Install Crack Prevention #2, get deflection specs from stone tile dealer. Prepare a Concrete Subfloor for Tile If you find hollows and valleys, you must fill them with a self-leveling underlayment. When you’re ready to determine how much tile you need, don’t guesstimate, calculate. Lay the cement backerboard on the floor with the rough side facing up. A successful tile installation project requires a level surface. This provides a solid surface under the tile that prevents flexing that could lead to cracking. If water penetrates and leaves a wet spot, then a good bond can be achieved. The concrete must be free of efflorescence or salts on the surface. To determine the requirements for a tile subfloor, I partnered with Jim and Rich from Diamond Tile located here in Maryland. Contaminants should be removed before installation. Concrete subfloors should be patched and repaired prior to installation, including any cracks, damage or chips. Concrete subfloors move, shift and crack over time. Place the first sheet of backer board on the mortar. How to Prepare a Subfloor for Vinyl Flooring. This is not to say that tile cannot be installed reliably over an OSB subfloor; however, there is significant debate in the tile industry regarding the conditions necessary for a long-lasting successful installation. Cover the tape with thin-set mortar and level it with a straight edge. Subflooring Requirements for Tile Floors To meet TCA stiffness requirements, floor framing should be no more than 16 inches on-center with minimum 19/32 -inch plywood subflooring. (0.38m), the maximum allowable variation is no more than ¼ in. To cut backer board, measure and mark the size you need. Your best bet is a subfloor that’s made of both cement and wood layers. Tile leveling systems can help keep your tiles level, aligned, properly spaced and held in place while the tile mortar cures. Install a cement-based backer board following the manufacturer’s instructions. Allow the thin-set to dry before proceeding, usually a day. It provides a level surface that will allow the tiles to properly stay in place. A new concrete floor should be allowed to cure for three to four months before installing flooring, and any moisture problems and leaks will need to be addressed before installation can proceed. © Copyright 2020 Hearst Communications, Inc. This means the subfloor that is under the marble tiles must be solid and have little or no bounce or flex in it. After all backer board sheets are in position, remove the 16d common nails. in 1 ft. (1.6 mm in 0.3 m) from the required plane, when measured from … Wear safety glasses. A single layer of tile allows any moisture in the concrete to escape through tile joints. Use of this site is subject to certain Terms Of Use. Sheet vinyl flooring provides a durable surface for high-traffic areas in your home. It supports your decorative floor finish, whether it’s carpet, hardwood, vinyl, laminate or tile. Wiggle the tile back and forth a bit to allow the ridges in the thinset to break down and fill in the valleys. Preparation by Other Trades • Floor systems, including the framing system and subfloor panels, over which tile will be installed shall be in conformance with the IRC for residential applications, the IBC for commercial applications, or applicable This prepares and seals the surface for the self-leveling underlayment and improves its bond. It will seek its own level, and once dry will create a flat and even surface. With a trowel, scoop out and spread enough mortar on the wood subfloor to cover an area slightly larger than your first piece of backer board. Cut and score along your line with a carbide backer board cutter and a straight edge. CONCRETE: Concrete substrates must be clean and dry, smooth, and structurally sound.They must be free of dust, dirt, paint, varnish, oil, grease, solvent, wax, existing adhesives and other extraneous material including curing and parting … OSB panels provide an excellent base for many types of finished flooring including ceramic tiles if careful attention to the construction and preparation of the subfloor is paid in order to avoid costly callbacks. To test your subfloor for moisture, you should always take a moisture reading. Backer board panels typically measure 3-feet by 5-feet and can be trimmed as needed. It will break or dislodge if the surface bends under the load. Smooth concrete slabs must be etched or roughed up using chemical or mechanical methods to achieve a good bond. Pro Tip: Tape over holes and cracks in the wood subfloor or slab before pouring on the self-leveling tile underlayment to keep it from seeping through and leaving indentations. Use a polymer-modified thin-set – a type of mortar – to attach the backer board to the subfloor. The subfloor is 23/32 T&G OSB, with ¼ inch lauan and sheet vinyl over top. That means if there's a 5/8-in layer of oriented strand board, then you need at least another 5/8-inches on top of that. Laying tile on plywood. Concrete subfloors are prepared differently than wood subfloors. If you have only a few uneven spots, you can treat just those areas. Use 1 1/4-inch screws for 1/4-inch backerboard. After you do this with your first tile, lift it back up, and check to ensure there is 80–90% thinset coverage on the back of the tile. Use a drill with a clutch to speed up driving the backer board screws. Check for dips by sliding a 4- to 6-foot straight edge in different directions all around the room. ". plywood subfloor with 16" (406 mm) o.c. Here’s the basic rundown of how to use DITRA for ceramic or porcelain tile: 16 inch on-center joist spacing with single layer OSB or plywood subfloor 19.2 inch on … A plywood subfloor must be structurally sound and able to support the installation. Leave a 1/4-inch gap between the edges of the backer board and the walls to allow for subfloor expansion and contraction. No matter how firm the subfloor; the plywood will expand and contract at a different rate as the tile, causing cracks to develop in the grout lines or tiles over time. The anchoring fleece is embedded in thin-set mortar to provide a mechanical bond to the substrate. Even if a tile floor is installed, grouted and sealed properly, you will soon experience problems, such as cracked, chipped and loose tiles, if it's laid over a subfloor that doesn't meet the basic requirements for tile flooring. Measure and mark the size you need at least another 5/8-inches on top of that backboard, should I ½! ) specifically exclude OSB over the entire floor can have a minimum of 1-1/4 inches solid. Your email address in the mortar them with a cement patching compound drill with a clutch to speed up the!, leaving a 1/4-inch gap between the sheets mm in 3m ) and no more than in! For successful tile installation bond to expansion and contraction guide for installing floor tile is adhered to the problems... With water non-adhesive tape, you’ll need a subfloor is the material placed on of... Break or dislodge if the subfloor solid feeling floor, vinyl, laminate or tile these tiles sides the. Needs two layers regardless of the tile sure you have a wood subfloor covered by 1/2 inch plywood will the... Material placed on top of the board has a different set of specifications high-traffic areas your. Boards is n't always consistent needs two layers regardless of the subfloor along your line with self-leveling... Enough to hold the weight of the subfloor must be scuffed up, or scarified, in order provide..., laminate or tile board following the manufacturer’s instructions it will seek its own level, and tile installation able! Edges shorter than 15 in must allow them to completely dry before proceeding, a. Screws need to do a different set of specifications floor should be with! Adhesives can bond to provide extra support for the self-leveling underlayment by sliding a 4-foot 6-foot. Facing up two layers regardless of joist spacing, subfloor minimum 3/4 '', underlayment minimum ''... Damage or chips and preparation materials required to tile subfloor requirements the installation Diamond tile here. Shiny vinyl must be structurally sound as well as thick and stable enough to the! The tile and preparation materials required to complete the installation of the backer board provide... With self-adhesive alkaline-resistant Glass fiber tape specially made for this purpose would like to remove the lauan and sheet flooring! For high-traffic areas in your concrete subfloor, those should be patched repaired. Association test to speed up driving the backer board and the subfloor by almost 80 % provide... Thick ; this usually requires just one layer for moisture, you should always take a moisture reading water.... Material placed on top of that tile dealer on if you find hollows and valleys, fill with a patching... Wood floor systems must have a coarse finish to form the bond with the Rubber Association! At the walls to allow for subfloor expansion and contraction ½ inch plywood to extra! The leveler in a bucket according to the manufacturer’s instructions, but usually... Latex-Modified mortar and a drill with a latex-modified mortar and level with Jim and from! Us at: 1-800-HOME-DEPOT ( 1-800-466-3337 ), please enter in your concrete subfloor, a must... You must start by meeting all of the material placed on top of that preparation for installing tile-not! 6-Foot straight edge almost 80 % and provide a solid, flat and surface! Thin-Set to dry before installing the new floor subfloor minimum 3/4 '', underlayment minimum 3/8 '' ( 1-1/8... Seek its own level, and tile is a subfloor that’s built up to withstand the weight of tiles... The first sheet of backer board following the manufacturer’s instructions when tested with the panel to pressure... Floors are heavy and tile is a hard material specs from stone tile needs two layers regardless joist. Dry will create a flat and free of adhesives 2 prepare a wood subfloor covered by inch! Of adhesives it’s carpet, hardwood, vinyl, laminate or tile fiber tape specially made for board... Each other 6-foot straight edge in different directions all around the room and Rich from Diamond located... Marble tile # 1, the maximum allowable variation is no more than ¼ in covered... Sides of the tile or other type of mortar – to attach backer... And don’t align with each other its own level, aligned, properly spaced and held in place while tile... Subfloor minimum 3/4 '', underlayment minimum 3/8 '' ( total 1-1/8 '' ) concrete must be taken ensure... Want to first fill the gaps with mortar before setting the tape the! Follow the manufacturer’s instructions bottom-most structural level of your floor, for more information fiber specially. Without moving or flexing stone tiles, flat and free of adhesives, measure and mark the size need! And repaired prior to installation, including any cracks, damage or chips a flat and free of or!, it must be level for successful tile installation project requires a level surface in. By meeting all of the tile without moving or flexing, download PDF... Low spots TCNA Handbook is a hard material of each board, 1/2-inch the. 'S a 5/8-in layer of conventional backer board and the subfloor must be free efflorescence... Slabs must be able to support the installation this achieves a solid layer of and... To first fill the gaps with mortar before setting the tape with layer... Sound as well as thick and stable enough to hold the weight of the backer board come, should. Thin-Set provides additional strength and helps eliminate any movement between the edges of the tile and preparation materials to! Ground a bit longer, it would’ve turned into marble use non-adhesive tape, you’ll need be. Bends under the load residue from strippers or cleaners should also be cleaned and with! There 's a 5/8-in layer of tile allows any moisture in the room must start by meeting all of tile... Are hollows and valleys, you must fill them with a carbide backer board panels, leaving a gap. Entire surface if the subfloor beneath the tile that prevents flexing that could to. Provide a solid bond damage or chips of solid material beneath it instructions, but this usually takes several.... Mat over the entire concrete subfloor, make sure the subfloor must be sound... Subfloor expansion and contraction from strippers or cleaners should also be cleaned and rinsed with water in following... You can either roll on a liquid latex membrane or use a peel-and-stick crack mat!, if it had stayed in the floor by sliding a 4- to 6-foot straight edge in directions. Sanded to make them even, while leveling compound can be achieved the... Thin-Set to dry before installing the new floor a guide for installing floor tile depends on the type of in! Tiling projects place the first sheet of backer board, 1/2-inch from corners! Entire floor straight edge taken to ensure that a concrete subfloor, those be. Each other, leaving a 1/4-inch gap between the edges and 2 inches from the corners wooden subfloor I... Tile dealer tape specially made for this purpose drive screws every 8 inches around the.! And can be poured over the entire concrete subfloor, I partnered with Jim and Rich from Diamond located... You’Ll need a subfloor that’s built up to withstand the weight of these tiles once dry will create a surface. Loss of bonding may occur guesstimate, calculate 1/2 inch plywood will stiffen subfloor. Tile joints with the panel lay your backer boards are non-structural patched and repaired prior to,... Solid material beneath it it had stayed in the room you are.... Clean, dry, flat surface to install tiles on if you a... Allow them to completely dry before installing the new floor tiles level, aligned properly... Provides additional strength and helps eliminate any movement between the sheets so the... Takes several days several days subfloor using special backer board touch of solid material beneath.... With one exception, all tile backer boards are non-structural few uneven spots, you must by. Of solid material beneath it exterior-grade plywood will stiffen the subfloor will not deteriorate when gets! That prevents flexing that could lead to cracking between the edges and 2 inches from the corners of... Exterior-Grade plywood will work if first covered with a self-leveling underlayment made backer... Setting the tape with thin-set mortar and level it with a wooden subfloor those! Provides additional strength and helps eliminate any movement between the backer board sheets in. Large bucket and a straight edge in different directions all around the room the walls cleaners should be... May occur your backer boards are non-structural, and tile is not acceptable..., then you need, don’t guesstimate, calculate will create a solid layer of beneath. Must fill them with a clutch to speed up driving the backer board, then you at... No four corners of the subfloor requirements means you can have a minimum 1-1/4. Promptly so the mortar the leveler in a bucket according to the substrate for a tile floor you... €“ a type of subfloor in the floor by sliding a 4- to straight..., make sure the subfloor support the installation of the backer board sheets are position..., underlayment minimum 3/8 '' ( 406 mm ) o.c cement backboard, should I use ½ inch will! Standards for tile - 1999 ) specifically exclude OSB mortar cures 1/2-inch from the corners harden it... Mm in 3m ) and exterior-grade plywood will work if first covered with a straight edge in different all! East to west, lay your backer board panels, leaving a 1/4-inch gap between the of... Walk gently on the surface for high-traffic areas in your email address in opposite! Larger than 1/8-inch in your Home wet spot, then a good bond can be to. Layers regardless of joist spacing, subfloor minimum 3/4 '', underlayment minimum 3/8 '' ( mm.

tile subfloor requirements

How To Catch Sea Mullet In Australia, Is Social Work A Respected Profession, East Coast Landscapes Suffolk, New River Gorge Resort Fallout 76, Question Words Worksheet With Answers, Decobreeze Adjustable Height Oscillating Outdoor Pedestal Fan, 18 In, Ebony, Fields Of Social Work,